Step 2: Engineering Transmittal

Transmittal Checklist

Once the initial application has received site approval an Engineering Transmittal (ET) is prepared..

  • Original Signed Application w/Photo
  • Cross Section
  • Soil Verification Statement
  • Site Plan
  • Construction Schedule
  • Appropriate Sealed Prints

______________________________________________________________________________________________

Soil Verification

  • This sealed document evidences that the contractor has performed the appropriate soil investigation and that same is suitable for the proposed structure.

  • Both site application and blueprint number are listed on the application.

______________________________________________________________________________________________

Site Plan

  • A site plan showing the location of the proposed construction and staging areas of cranes is also included.

  • This information also includes the clear distance of any crane to the rail and pick specifications.

______________________________________________________________________________________________

Construction Schedule

  • This document outlines the construction itinerary.

  • It provides the day each activity will be conducted as well as expected duration.

 